Delivery and installation

Precision logistics. Expert installation. Predictable performance.

Get a quote
Talk to an expert
M4 L7.jpg

At Donaldson Timber Systems, we don’t just manufacture high-performance timber frame systems, we deliver and install them with the same precision, care, and professionalism that defines our offsite manufacturing.

Our approach to delivery and installation is built around Just-In-Time (JIT) logistics, qualified installation teams, and construction project management that keeps every development on schedule.

It’s a process designed to ensure efficiency, quality, and safety, while reducing site congestion, storage needs, and unnecessary cost.

Learn more

Just-in-time delivery for maximum efficiency

Every one of our build systems, whether a Sigma® II closed-panel or open-panel timber frame, is delivered to site exactly when it’s needed for installation.

Our Just-In-Time (JIT) delivery model ensures that panels arrive in the correct sequence for immediate crane installation, eliminating the need for on-site storage or double handling.

Benefits of JIT Delivery:

  • No on-site storage required – panels arrive ready for immediate installation.

  • Reduced site congestion – smaller compounds and less plant equipment required.

  • Improved safety and logistics – fewer vehicle movements and clearer access routes.

  • Less material waste and damage – panels are installed directly from transport, protecting quality.

  • Optimised programme certainty – deliveries aligned precisely to installation scheduling.

By aligning our logistics with the build programme, we help you maintain predictable, efficient, and safe site operations.

Learn more
M3 L3.jpg
HemelHempstead-02.07.24-75.jpg

Professional installation by qualified teams

Once panels arrive on site, our qualified timber frame installers take over.

Working alongside our construction project managers, they ensure every system is craned, aligned, and secured with precision, following our approved installation processes and building regulation standards.

Our installation teams deliver:

  • Safe and efficient crane operations for rapid structural assembly.

  • Professional handling of every closed panel and open panel timber frame component.

  • Consistent build quality that matches the precision of our offsite manufacture.

  • Compliance with Future Homes Standard, MMC Category 2, and building regulations.

  • Clear communication with site management, ensuring seamless sequencing with follow-on trades.

With years of experience and regular training through our Timber Frame Training Programmes, our installation teams represent the very best in UK timber frame expertise.

Learn more

Construction project management you can trust

Every project benefits from direct support from our construction teams, specialists who oversee delivery, installation, and site coordination to make sure your project runs to plan.

Their role is to:

  • Manage installation sequencing to align with site progress and crane availability.

  • Work collaboratively with your site management and subcontractors.

  • Ensure health and safety compliance at every stage of installation.

  • Monitor progress against programme milestones to ensure deadlines are met.

  • Provide real-time support and communication throughout installation.

With our project management, you gain not only offsite precision but also onsite assurance, guaranteeing your structure is installed safely, on time, and ready for follow-on trades.

Learn more
image 15.jpg
Hero.jpg

Building Smarter, Safer, and Faster

Our delivery and installation process is designed to give you full confidence, from factory floor to site handover.

By combining offsite manufacturing precision with expert on-site delivery and installation, DTS ensures every project benefits from:

Speed – faster build times and earlier weather-tight completions.

Predictability – reliable scheduling and reduced on-site risk.

Performance – precision-installed structures that perform exactly as designed.

Sustainability – fewer vehicle movements and reduced carbon footprint through JIT logistics.

More from Donaldson Timber Systems

Open panel systems

Timber frame build systems and certified closed panel solutions

Learn More
Open panel systems

Timber frame build systems and certified closed panel solutions

Learn More
Open panel systems

Timber frame build systems and certified closed panel solutions

Learn More
DTS_Logo_Fullcolour_RGB-e1678988183561_edited.png
DTS_Logo_Fullcolour_RGB-e1678988183561_edited.png

Ready to start your timber frame journey?

Whether you’re an architect, developer, or self-builder, our experienced team is ready to guide you through every stage of your timber frame project—from concept and design to manufacture and installation.